国产精品嫩草影院入口一二三_99r6这里在线精品视频_久久99这里只有是精品6_久久99精品久久久久久不卡 无码骚夜夜精品,超碰97人人模人人爽人人喊,亚洲成Av人在线观看网站,国产高清不卡一区二区

Contact Us

Cross Flow Fan Installation and maintenance requirements

Date: 2016-5-13   Click: 1609 Times

1, "Cross Flow Fan" ambient temperature should be 75ºC ≥ -40ºC.
2, industrial gas through the cooling fan does not allow strong acid, alkali and various solutions.
3, does not allow dust and other debris fall into the fan, so as to avoid burning and fan blades break.
4, "Cross Flow Fan" before installation should first check whether the damage caused due to packing and shipping, deformation, if damaged or deformed should be repaired after installation.
5, and then check the "Cross Flow Fan" all parts and screws are loose; whether touching or displacement between the blade and duct before installation if the touching or the shift should be adjusted. To replace the fan products from different manufacturers, you need to measure fan site size holes.

Back to: Industry news

+86-0769-83660708

Home Product News Contact